28 resources
https://youtu.be/f2igqOBKlUo
Video
The Paramount project video
The Paramount project in Richmond, BC is the deepest cutter soil mixing (CSM) depth achieved by Keller in Canada. Watch the CSM rig in action creating a structural cut-off wall.
Play
https://youtu.be/tH5uVBMoz1I
Video
Robinson Landing project video
Despite the challenges of working on the Potomac River adjacent to historic buildings and the discovery of an old ships's hull, Keller constructed a watertight TRD earth retention system on time and with minimal movement.
Play